RailForum.com
TrainWeb.com

RAILforum Post New Topic  Post A Reply
my profile | directory login | register | search | faq | forum home

  next oldest topic   next newest topic
» RAILforum » Passenger Trains » Amtrak » SPEED

   
Author Topic: SPEED
JWB7400
Junior Member
Member # 1206

Rate Member
Icon 1 posted      Profile for JWB7400     Send New Private Message       Edit/Delete Post   Reply With Quote 
HOW FAST CAN A FREIGHT TRAIN GO ON 90LB RAIL
(GOOD CONDITIONS)

Posts: 28 | From: HUNTSVILLE,AL USA | Registered: Dec 2001  |  IP: Logged | Report this post to a Moderator
Gilbert B Norman
Full Member
Member # 1541

Member Rated:
4
Icon 1 posted      Profile for Gilbert B Norman     Send New Private Message       Edit/Delete Post   Reply With Quote 
Not sure, but I, for one, would not want to be anywhere near one exceeding 30mph; sonm of my former road's lines 10mph!!!!
Posts: 9977 | From: Clarendon Hills, IL USA (BNSF Chicago Sub MP 18.71) | Registered: Apr 2002  |  IP: Logged | Report this post to a Moderator
George Harris
Full Member
Member # 2077

Member Rated:
4
Icon 1 posted      Profile for George Harris     Send New Private Message       Edit/Delete Post   Reply With Quote 
This is somewhat like how high is up?

With good ties, good ballast support, good aline, level, and cross level, you can go just about as fast on 90 lb rail as you can on 136 lb rail. The big difference is that it will take a lot more work, and I do mean A LOT MORE WORK, to keep the track with 90 lb rail in good condition because the rail does not spread the load over as long a distance. Also, the lighter rail will be much less tolerant of poor tie condition and variances in support condition, same basic reason, the light rail does not spread the load as well as heavier rail. Stresses in the rail will be higher, so the fatigue life will be much shorter than for heavier rail.

A number of year ago a company, which shall remain nameless to protect the guilty, started running a 3 or 4 times a week unit coal train (in 263,000 lb limit days) down a branch that was in 80 lb rail, and had a 35 mph speed limt. They reliad the line with 90 lb rail and replaced about 2/3 of the bad ties, and gave it a 3 inch lift of new blast furnace slag ballast on top of the old cinder ballast. The management could not understand why the train still derailed about one trip out of four.

It was not just the rail, it was the whole picture that was wrong. First, the 90 lb rail was nearly 60 years old air cooled rail with a fair amount of wear, and lots of small internal defects. It was laid jointed, not welded up. It should have been cropped and welded. Second, they should have replaced ALL the bad ties. Thirdly, at teh very least the shoulders in the cinder ballast should have been plowed out or better, the whole track sledded such that there would be good draining shoulders at no less than 6 inches of fresh ballast on top of the cinders and under the ties. Drainage work was also needed in numerous locations. You got to keep your subgrade from developing water pockets. With all this, done, the performance would have been much better. Of course, they could have laid new 132 lb rail with the 2/3 ties low lift fixes and probably also kept the train on the track much better, but they would have severely shortened the life of the 132 lb steel because of the poor support.

It is fairly well true that you are going to spend the money it takes to have good track. Either you are going to spend it on the track or you are going to spend it picking up the pieces and fixing the problems that you get from not having good track, but one way or the other the money will be spent.


Posts: 2808 | From: Olive Branch MS | Registered: Nov 2002  |  IP: Logged | Report this post to a Moderator
rresor
Full Member
Member # 128

Rate Member
Icon 1 posted      Profile for rresor     Send New Private Message       Edit/Delete Post   Reply With Quote 
George: Interesting comment. I'd suspect that with cinders underneath the new ballast, they had a devil of a time maintaining line and surface. Cinders have the stability of a feather pillow.

To return to the original question: FRA track standards are completely silent on WEIGHT of rail. They deal with geometry, tie condition, and such things as rail end mismatch, but in no way relate allowable speed to rail weight.

That having been said, I'd like to add that any rail less than 90 lbs. per yard should be replaced (or the line abandoned). Reason: 286,000 lb. cars (36 ton axle loads) stress rail of 85 lbs. or less beyond its yield strength, so every car of that weight that operates will deform the rail. It's only a matter of time before stress fractures start to occur.

For mainlines, nothing less than 115 lb. rail should even be considered. But that's...just my opinion.


Posts: 614 | From: Merchantville, NJ. USA | Registered: Aug 2000  |  IP: Logged | Report this post to a Moderator
George Harris
Full Member
Member # 2077

Member Rated:
4
Icon 1 posted      Profile for George Harris     Send New Private Message       Edit/Delete Post   Reply With Quote 
RResor:

Complete agreement with you, except, if we are talking about trains instead of the random car, if you are buying new material, I would say buy 136RE at least. If used, go for 132 lb/yd or better. If you have 85 lb or less, if you can not get something at least 100 lb/yd to put in, it is probably not worth the effort to simply stick in 90 lb or another light weight rail. If you budget is minimal, you are better off spending it on ties and drainage work.

[This message has been edited by George Harris (edited 11-19-2004).]


Posts: 2808 | From: Olive Branch MS | Registered: Nov 2002  |  IP: Logged | Report this post to a Moderator
   

Quick Reply
Message:

HTML is not enabled.
UBB Code™ is enabled.

Instant Graemlins
   


Post New Topic  Post A Reply Close Topic   Feature Topic   Move Topic   Delete Topic next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:


Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us