RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Passenger Trains » Amtrak » Additional Surfliner to SLO » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
mr williams
Member # 1928
 - posted
Anybody know any more about the proposed early morning departure from LA to San Luis Obispo? The last I heard Amtrak were hoping for a June/July start-up subject to getting a slot from the host railroad but it seems to have gone quiet.
 
mr williams
Member # 1928
 - posted
I can partially answer my own question, as I e-mailed Amtrak and got the reply that it now isn't going to be until the Fall, but they hope to be running by Thanksgiving.
A couple of the Central Coast local newspapers are also reporting this and have published a provisional timetable.

The northbound train will leave LA at 7.30am, arriving SBA 10.10, Lompoc 11.32, Guadaloupe 12.07, Grover Beach 12.23 and SLO 12.55.

The southbound leaves SLO 1.40pm, GVB 2.00, Guadaloupe 2.16, Lompoc 2.59, SBA 4.25 and LA 7.10.

Still all provisional, though.
 

sbalax
Member # 2801
 - posted
Make that Guadalupe, Mr. Williams. Guadaloupe is, I believe, an island in the Caribbean.

Will this be operated with Surfliner equipment of the older single level cars?

Frank in SBA
 

MPALMER
Member # 125
 - posted
According to RailPAC, a set of single-level Horizon cars will make this run.
 
pismobum
Member # 2628
 - posted
latest word was service would start with the fall timetable change. The horizon set used will be "captive" to the run, and a trip destined south of Los Angeles will involve a train change at LAUPT.
 
sbalax
Member # 2801
 - posted
Did I read somewhere on here that a full-length dome car was also going to be used in this train set? Perhaps for use by Business Class passengers?

Frank in Beautiful SBA
 

mr williams
Member # 1928
 - posted
Oops...quite right, Frank....Santa Barbara to Guadaloupe by train would be some journey!

Is the Fall timetable change the last Monday in October? Just my luck if it is as I'll probably be in Santa Barbara a week and a half before that heading for Pismo, and a 10.10 am departure would have been perfect.
 

MPALMER
Member # 125
 - posted
Actually it's usually around the Standard Time/Daylight Time (fall back) weekend, so it would be the Sunday instead of the Monday.
 
mr williams
Member # 1928
 - posted
It's confirmed to start on November 17th, dep LAX 07.30am arr SLO 12.45pm, returning from SLO at 1.40pm arr LAX 7.10pm.
 
chrisg
Member # 2488
 - posted
I will be on the first run and write a story for all to read as usual.
http://www.trainweb.org/chris

Chris
 

fubu05
Member # 465
 - posted
I will be on 799 (17) Ventura-San Luis and train #798 (17) San Luis-Los Angeles and will then take train 796 (17) Los Angeles-San Diego for a public hearing pertaining to San Diego Trolley and San Diego bus service changes effective June 12, 2005.
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us