RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Passenger Trains » Amtrak » Kansas City Union Station » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
Iron Mountain
Member # 12411
 - posted
The December issue of "Trains" magazine has a great article about Kansas City Union Station. One of the positive lessons from the article is how the "can do" attitude of a community can make good and grand things happen without endless exclusive dependency on big government. Hope everyone gets a chance to read it.
 
Gilbert B Norman
Member # 1541
 - posted
Bravo; reviewed it just this morning.

Little did I know that Jack Stacks restaurant, where Mr. Pullman and I have gone together, appears to be located in a one-time MILW facility. By my day at the MILW, they had reloed to N KC at a joint agency with the KCS. This enabled both roads to interchange traffic without using KCT Ry and minimizing use of such in interchanging with others such as ATSF.

KCT Ry was divided into zones; the less of them you used, the less you paid.
 
PullmanCo
Member # 1138
 - posted
Since I live in KC,

The 1st key issue is footprint. When Union Station got its rebuild, KC needed office and meeting space. It got superb space. Its finally got a business model that works, too.

The 2nd key issue was funding. We were able to get a regional tax in place to fund the rebuild. That said, that was the only time a regional tax passed.

Amtrak uses two tracks which appear not to have been part of the original station. They are north of the original main waiting room.
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us