RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » General Forums » Railroad News » Chatsworth, CA - Tunnel #26 to be renovated! » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
Robert F
Member # 141
 - posted
I just read this on Metrolinks website: http://www.metrolinktrains.com/ventura_tunnel_project.htm
This is one of the longest train tunnels west of the ol' Missip. All North and Southbound Amtrak trains on the west coast run through this tunnel.
(scroll below)
-Robert F.

VENTURA COUNTY LINE

TUNNEL 26 REHABILITATION PROJECT

Dear Ventura County Line Passengers:
To increase the speed and comfort of your Metrolink commute from Ventura to Los Angeles, Metrolink will be rehabilitating the Chatsworth Tunnel, also known as Tunnel #26, this fall.
From September 30 through October 16, buses will replace train service between Oxnard and Chatsworth. Passengers who board in Oxnard, Camarillo, Moorpark and/or Simi Valley in the morning, may ride specially designated buses from these stations to Chatsworth Station. Upon arriving at Chatsworth, bus passengers will transfer to Metrolink trains, which will make all subsequent station stops to Los Angeles.
In the afternoon, northbound trains from Los Angeles will travel as far as Chatsworth Station. At Chatsworth, riders will board buses that make all subsequent station stops, at Simi Valley, Moorpark, Camarillo and Oxnard.
Metrolink will update our riders and this web page about any new developments as the project date nears and throughout the duration of the construction. Please visit this site periodically to stay informed of the latest news.
Please review the preliminary schedule for Bus/Train service during the two-week period from September 30 to October 16, 2000.
Metrolink strives to provide safe, comfortable, convenient commuter train service to Southern California residents. After the upgrades, train travel through the tunnel will be faster, thereby reducing overall commute time.
NOTE: Passengers with wheelchairs can be accommodated, but they must call Metrolink in advance at 800-371-LINK. Also note that bike accommodations will not be available on the buses.

 




Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us