Post A Reply
my profile
|
directory
login
|
register
|
search
|
faq
|
forum home
»
RAILforum
»
Railfans
»
Western US
»
Huntington Beach Line
» Post A Reply
Post A Reply
Login Name:
Password:
Message Icon:
Message:
HTML is not enabled.
UBB Code™ is enabled.
[QUOTE]Originally posted by atsf3751: [QB] CWR has been laid the entire length of the HB branch up to Stanton Jct. It looks like they have laid the rail right over some of the industial spurs, so the locals might be temporarily curtailed or very short as chipsca suggests. I didn't see any sign of MOW activity and no work trains or other equipment between Stanton Jct. and Edinger. They might be farther down, but it IS Saturday, so perhaps they're not working. I'll try to keep my eye on it though. [/QB][/QUOTE]
Instant Graemlins
Instant UBB Code™
What is UBB Code™?
Options
Disable Graemlins in this post.
*** Click here to review this topic. ***
Contact Us
|
Home Page
Powered by
Infopop Corporation
UBB.classic™ 6.7.2
Copyright © 2007-2016
TrainWeb, Inc.
Top of Page
|
TrainWeb
|
About Us
|
Advertise With Us
|
Contact Us