RailForum.com
TrainWeb.com

RAILforum Post A Reply
my profile | directory login | register | search | faq | forum home

» RAILforum » Railfans » Eastern US » remote control » Post A Reply

Post A Reply
Login Name:
Password:
Message Icon: Icon 1     Icon 2     Icon 3     Icon 4     Icon 5     Icon 6     Icon 7    
Icon 8     Icon 9     Icon 10     Icon 11     Icon 12     Icon 13     Icon 14    
Message:

HTML is not enabled.
UBB Code™ is enabled.

 

Instant Graemlins Instant UBB Code™
Smile   Frown   Embarrassed   Big Grin   Wink   Razz  
Cool   Roll Eyes   Mad   Eek!   Confused    
Insert URL Hyperlink - UBB Code™   Insert Email Address - UBB Code™
Bold - UBB Code™   Italics - UBB Code™
Quote - UBB Code™   Code Tag - UBB Code™
List Start - UBB Code™   List Item - UBB Code™
List End - UBB Code™   Image - UBB Code™

What is UBB Code™?
Options


Disable Graemlins in this post.


 


T O P I C     R E V I E W
CSXFANDAN
Member # 1844
 - posted
I took this from csxt page.


CSXT Introduces Remote Control Technology

The introduction of Portable Locomotive Control Technology (PLCT), also known as remote control technology, is under way on CSX Transportation and all other Class I railroads. The implementation began last month and comes after other North American railroads have used this technology successfully over the past several years to improve safety and productivity. Contained on this page are a letter from Al Crown, CSXT Executive Vice President-Transportation; Fast Facts and Frequently Asked Questions, which cover much of the information currently available about remote control technology. If you have additional questions, please e-mail us and you will get a reply within two business days.
 

conrailkid
Member # 1898
 - posted
yeah, for those of us who work with the garbage, its a joke. only thing they (CSX) accomplished was taking a productive 3 man crew (eng, cond, brkmn) and reduce it to 2 man by taking the engineer away. the only reason these "toy" trains are so productive is that the crews aren't given the same work load that the old 3 man crew gets. if csx can divert non-essential freight to non-remote yards, the number of cars in the remote yard is less, and the remote looks like it does real good. also, keep in mind- more run through switches, runaways, grade crossing incidents- yeah- its a real smart idea. the only good thing i find with ns is that they don't use it!
 
CSXFANDAN
Member # 1844
 - posted
OUCH!!!!!!
 
Andybuzz2u
Member # 2008
 - posted
I work for the BNSF in Houston, Tx though we dont have any yet there a comeing to a rail yard near you..they have one up in Temple,TX out crew change point and it falls so far behind in the yard that they have to call a extra job with a normal crew to catch it back up...and it runs three tricks a day. So they keep there extra boards a turning!
 
conrailkid
Member # 1898
 - posted
that's been the norm here in baltimore on csx. the railroad has diverted as much non-essential freight away, and the remote crews play through their shifts. more often than not, there isn;t a qualified remote crew available, the remote engine is broke down, or no qualified extra men to fill vacancies on the remote job. it's so bad here that they've been calling a utility engineer to stand by in case the remote fails, then the run as a regular switcher!
 



Contact Us | Home Page

Powered by Infopop Corporation
UBB.classic™ 6.7.2




Copyright © 2007-2016 TrainWeb, Inc. Top of Page|TrainWeb|About Us|Advertise With Us|Contact Us